Friday 20 November 2015

LBS Clifton Housing, Peckham

AMA is working in the Mott MacDonald team on two projects in Peckham. The Cator Street Dementia Daycare facility (centre of Excellence), and Clifton Housing. The housing scheme will provide 8 units, including one accessible unit, and is currently on site and due for completion early in 2016.
This is a very difficult and tight site. Formerly a series of underused garages it was important to knit the proposals with the local infrastructure and community needs. The project was overwhelmingly popular with local residents and at public meetings the reaction was totally positive and the proposals seen as a strong indicator of major improvements in the area.

AMA’s role was to develop proposals for this tight site and get the best orientation possible on this polluted and inhospitable road. This was achieved by good acoustic insulation, putting living rooms to the quieter east side, and the option of using fresh air mechanically delivered from the cleaner rear areas.

No comments:

Post a Comment

UA-53860150-2